Projects



This is a new ediable area. By default it's hidden.

← Back to Blog

Rajamandala Hydroelectric Power Plant

Mar 29, 2019 Rajamandala Hydroelectric Power Plant
Period         : May 17, 2018 – March 29, 2019 Contractor  : Cipta Rupa Pertama, PT, Multi Karya Engineering, PT & Tekniko Indonesia, PT Owner         : Hyundai Engineering Co. Ltd Products     : Cebex 100, Nitocote AC, Nitobond EC, Conbextra EP10TG (FOSROC), Sikafloor®-81 EpoCem® New HC (Sika), CYH-500, CYH-202, PM-3 & EPL-550; polyurethane-polyurea hybrid spray coating system (JTCC)  

Explore Topics


Featured Category

Showing posts from the first available category only.

← Back to Blog

Rajamandala Hydroelectric Power Plant

Mar 29, 2019 Rajamandala Hydroelectric Power Plant
Period         : May 17, 2018 – March 29, 2019 Contractor  : Cipta Rupa Pertama, PT, Multi Karya Engineering, PT & Tekniko Indonesia, PT Owner         : Hyundai Engineering Co. Ltd Products     : Cebex 100, Nitocote AC, Nitobond EC, Conbextra EP10TG (FOSROC), Sikafloor®-81 EpoCem® New HC (Sika), CYH-500, CYH-202, PM-3 & EPL-550; polyurethane-polyurea hybrid spray coating system (JTCC)