Projects



This is a new ediable area. By default it's hidden.

← Back to Blog

PTPV/ TVM (Touch Voltage Membrane) Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading - Velodrome

Aug 16, 2018 PTPV TVM (Touch Voltage Membrane) Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading - Velodrome
Period         : April 18, 2018 – August 16, 2018 Contractor  :  Wijaya Karya (Persero) Tbk, PT Owner         : Indonesian Ministry of Public Works & Housing Products     : Malech, Mapeplan TVM, Mapejoint T-Lock Control Joint & Plastimul PU-W (MAPEI)  

Explore Topics


Featured Category

Showing posts from the first available category only.

← Back to Blog

PTPV/ TVM (Touch Voltage Membrane) Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading - Velodrome

Aug 16, 2018 PTPV TVM (Touch Voltage Membrane) Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading - Velodrome
Period         : April 18, 2018 – August 16, 2018 Contractor  :  Wijaya Karya (Persero) Tbk, PT Owner         : Indonesian Ministry of Public Works & Housing Products     : Malech, Mapeplan TVM, Mapejoint T-Lock Control Joint & Plastimul PU-W (MAPEI)