Projects



This is a new ediable area. By default it's hidden.

← Back to Blog

Siphon Bridge Repair @Cibeet River, Karawang

May 04, 2016 Siphon Bridge Repair
Period         : April 20 –May 4, 2016 Contractor  :  SACNA-BASUKI JO Owner         : Pemkab Karawang Products     : DeWALT AC100, Conbextra GP Premix,  Conplast SP430D, Fosroc PPF, Nitobond SBR (FOSROC), MasterEmaco SBR2 (BASF)  

Explore Topics


Featured Category

Showing posts from the first available category only.

← Back to Blog

Siphon Bridge Repair @Cibeet River, Karawang

May 04, 2016 Siphon Bridge Repair
Period         : April 20 –May 4, 2016 Contractor  :  SACNA-BASUKI JO Owner         : Pemkab Karawang Products     : DeWALT AC100, Conbextra GP Premix,  Conplast SP430D, Fosroc PPF, Nitobond SBR (FOSROC), MasterEmaco SBR2 (BASF)